With sections of hydraulic tunnels between 25 m2 and 41 m2, the objectives were to obtain the best blasting progress (> 95%) minimizing the damage…
2901.2017
With sections of hydraulic tunnels between 25 m2 and 41 m2, the objectives were to obtain the best blasting progress (> 95%) minimizing the damage…
Optimization and simulation of rock vibration and projection in Malartic, for 1 million tons in blasting 200 meters from the village. 22% maximum deviation for…
The main objective in blasting is fragmentation. A reduction in the maximum size of rock fragments to facilitate the use of a crusher is a…
Predict the result of a mine blasting. Who has not dreamed of having that prediction tool? The use of explosives produces results that are often…