More than 500 blasts have been successfully designed and implemented. The blasting model was made with the advanced elemental wave optimization module with the I-Blast…

Vibration modeling An elemental wave shot was executed and processed to find the best initiation sequence to reduce vibration.

More than 300 blasts have been successfully designed and implemented thanks to the I-Blast ADV software and especially its advanced signature auger in the optimization…

TBT supports Jean Lefebvre in dealing with complaints from neighbors in a very sensitive area around the quarry of Chateauneuf les Martigues. TBT knows the…

10 years of successful vibration management at the Lafarge quarry. Reduced vibration -70% and 90% reduction of complaints.

More than 500 blasts have been successfully designed and implemented controlling vibration, air blow, rock blasting, and fragmentation <800mm and >150mm in size, in a…

With sections of hydraulic tunnels between 25 m2 and 41 m2, the objectives were to obtain the best blasting progress (> 95%) minimizing the damage…

GTM

Design of blasting plan, technical assistance for the loading of drills, total control of the seismic level tunnel of La Borne Romaine NICE -MONACO. SERVICES…

Definition of underground blasting methods, technical assistance in the field by blasting, measurement and control of seismic problems for the new train station. SERVICES  Design…

Time optimization through numerical simulation for two tunnels in the center of Monaco. The distances to the nearest building were very short (30 m) and…