Cerro Verde

Analysis and simulation of the vibration to define how close to the area where 3 fuel stations of 1.4M liters and a network of steel pipes are built, a future blasting production should be executed.
Study based on simple shot monitoring to calculate the operating charge by delay versus distance and analyze the influence of PPV synchronization.