GTM

Design of blasting plan, technical assistance for the loading of drills, total control of the seismic level tunnel of La Borne Romaine NICE -MONACO.

SERVICES

  • Design and performance of blasting tests
  • Blasting design in production drills
  • Technical assistance and field control
  • Blasting equipment formation
  • Tracking mission and control the seismic level of vibrations

RESOURCES

  • Field permanence engineer
  • I-Blast software: advanced design and blast optimization
  • Seismographs
  • Sound level meters